The Draft Bicycle Strategy for Northern Ireland needs your input. A public consultation is running until Friday 21st November 2014, and your views will help to determine the path which DRD will plot over the next 25 years to deliver the Cycling Revolution™ in Northern Ireland.

drd_bicycle_consultation_event
DRD Cycling Unit Head Andrew Grieve at the Belfast consultation event

You can read the full Draft Bicycle Strategy for Northern Ireland by downloading it from the DRD website. You can respond to the Draft Strategy a number of ways, listed at the end of this article.

So, what are the hot topics for @nigreenways in the Draft Strategy?

That headline vision statement

“To establish a cycling culture in Northern Ireland to give people the freedom and confidence to travel by bicycle, and where all road users can safely share space with mutual respect.”

Normal
Confusing pre-Bicycle Strategy outbreak of everyday cycling; ignore this..

A decent start, but it’s a few tweaks away from perfection..

Don’t repeat the past mistake of positioning the Bicycle Strategy as a government-led attempt to cold start growth in cycling. Credit is due to DRD for your work over the last year to create the Cycling Unit and this Strategy, but you are pedalling furiously to catch up with the reality on the ground.

TronBelfast

Cycling is on a clear growth curve, even if it remains quite niche as a province-wide activity. An inspired and serious government intervention is needed to push cycling into the mass market. Take this obvious opportunity to put the Bicycle Strategy on the front foot and present a far more efficient vision statement..

“To build on the developing cycling culture in Northern Ireland and create the conditions to give everyone the freedom and confidence to travel by bicycle.”

Sorry, but the twelve words after “bicycle” in your vision is meaningless fillerIt sounds like a really bad DOE road safety advert (and there are many of those) and I genuinely believe the DRD Cycling Unit is better than that. Drop it. Inspire us.

Bicycle Strategy or Cycling Strategy?

“We feel that it is significant that this document is called a ‘Bicycle Strategy’ rather than a ‘Cycling Strategy’ as it presents a clear signal that we are planning for a mode of transport, rather than simply the activity of ‘cycling’.”

Ride11
Two bicycle riders in Belfast arguing about the title of the strategy

It’s astounding how much precious time and oxygen was wasted at stakeholder consultation events discussing this. Knock yourself out. Moving on..

Design for everyone, or no-one

One section of the Draft Bicycle Strategy for Northern Ireland caught the attention (and ire) of cycling campaigners across the UK and Europe:

designing_for_bicycle_users

Northern Ireland’s very own Dutch cycling expert Cargobike Dad put it perfectly in his own takedown of this section:

“The table has been adapted from the English Department for Transport, published in 2007 .. if we want to look at best practice we should not look to England 7 years ago. It would better to hold them up as an example of how not to implement a cycling strategy.”

As for those fast commuters, alarm bells should be ringing at DRD when everyday bicycle commuters with decades of experience can’t take the hassle on Belfast’s busiest roads any more..

https://twitter.com/stevenpatt99/status/532246062283882496

What are the logical outcomes of designing for types of cyclists when DRD considers future route development plans? That high-quality separated cycling infrastructure is less likely around workplaces, or on arterial routes? That it’s more likely around schools? How do you measure the demand among different groups in any particular area? Good luck showing me an area in Belfast that is purely dominated by one of these types, especially if the Cycling Revolution™ actually happens.

This section got a roasting back in August..

profiles

I was planning to write a pithy tirade detailed explanation of why the inclusion of user profiles is a very bad idea, but I’ll give you a 100% guarantee that this section of the Draft Strategy is going to be quietly dropped for the final version. Why? Fast forward to November and everything changed..

bricycle

And who is @bricycle? He’s Brian Deegan, Principal Technical Planner at Transport for London who’s worked in project management on the London Cycle Network for the past six years – and one of the speakers at the recent Changing Gear conference, organised by (wait for it) the DRD Cycling Unit..

The simple principle behind the world’s best cycling infrastructure (also highlighted by Brian Deegan at the conference as being in The Netherlands) is that cycling infrastructure should be designed for everyone to use. To plan a Bicycle Strategy on any other basis puts compromise at the heart of the next 25 years of development.

Cross-government buy-in

“Our ‘cycling future’ is interrelated with a number of other factors .. responsibility for some of these areas sits with other Government Departments or public bodies. For this reason we feel it is vitally important that we work across the sectors to develop and implement this strategy to make sure that the greatest benefits are delivered for everyone.”

https://twitter.com/cvharper999/status/442341953297219584

This is crucial to success – access to the power and influence of the shocking number of government organisations with responsibility for cycling here will determine positive outcomes. Understanding of the needs of cycling development is patchy – eg the Public Health Agency definitely gets it, but the Department for Social Development (leading on public realm projects) does not..

Along with finding guaranteed annual funding for this grand vision, how well the DRD Cycling Unit and the Minister can marshal and direct cycling activities across government will determine the Bicycle Strategy’s success. Which leads us neatly on to..

Aiming.. where exactly?

“We have consciously chosen not to set an arbitrary Northern Ireland wide target for the percentage of people cycling by a nominal date as we do not think it will be useful in encouraging people to use the bicycle as a mode of transport at local level. The Delivery Plan [to follow] will contain a series of specific, measurable, achievable, realistic and time bound objectives, policies and actions. This will form the basis for the monitoring undertaken on the progress made by the Strategy.”

IMG_9754-001
Cycling growth evident in winter rush hour, but cycling still pushed to the margins (by DSD again)

After many discussions I understand (and to some extent sympathise with) DRD’s rationale for not placing an over-arching target within this strategy. The subsequent Delivery Plan, city and local area masterplans will carry the SMART objectives and targets. Grand, and the campaigning corps can’t wait to get its teeth into those plans.

Having no big target(s) may lend flexibility to your work, or could be the biggest flaw in the foundations of the Bicycle Strategy. A big target certainly isn’t “useful in encouraging people to use the bicycle” but it is close to essential in navigating the political stream for 25 long years.

Consider this statement by Minister Danny Kennedy at the Regional Development Committee on Wednesday 12th November 2014 (28:03 onwards):

“The Chair and this Committee will know about the challenging financial position that we find ourselves in, particularly next year. But this is a Programme for Government commitment (it’s also a commitment that I’m committed to) and so the necessary finance will have to be effectively ring-fenced for this project to be carried forward. And that is a challenge for this Department, and it’s a challenge for me, but I have to rise to that challenge. And I’ve no doubt that I would rise to the challenge with the support of this Committee, with Executive colleagues, with the Assembly in general and with public opinion..”

Imagine a future Transport Minister defending DRD Cycling Unit infrastructure plans with this robust certainty. This particular issue was about a railway upgrade plan in difficulty, but because it’s in the Programme for Government (PfG) there’s no argument about “if”, just “how”.

Cycling needs its own place among the PfG targets. Splitting by urban/rural, or Belfast/rest of NI makes a lot of sense given the diverging cycling environments. But if cycling infrastructure planning and/or an over-arching growth target is in there after the next election, a mainstream budget will be easier to embed, and suddenly cycling climbs one more step above the day-to-day political fray.

Will a series of area plans with targets and budgets make into the PfG? That’s highly doubtful. Does this risk leaving each plan to fight tooth and nail for survival in a hostile political environment?

So make sure you’re being smart about that target decision, and think about the realpolitik in 2 years, 5 years, 10 years, 20 years from now. Can you make it politically super difficult for the next Minister to roll back on commitments made in the Bicycle Strategy? Can ambitious headline targets foster competition between political parties to build reputations, policy commitments and delivery on cycling? Or will you be kicking yourselves as the vision and aspirations slowly evaporate over the years?

I welcome the Draft Strategy, but more importantly I have faith in the quality of the people who are working in the DRD Cycling Unit. This is a once-in-25 years opportunity to get it right..

What do you think?

Those were just a few of the key topics covered by the Draft Bicycle Strategy for Northern Ireland. Please do take the time to read it and send your thoughts to the DRD Cycling Unit. For more perspectives on the document you should also:

How to respond

Anne Burke
Cycling Unit
Department for Regional Development
Clarence Court
10-18 Adelaide Street
Belfast

Telephone: 028 9054 0179
Fax: 028 9054 0662
Minicom/ TextPhone: (028) 9054 0642
Text Relay Service: (028) 9054 0179
(prefix 18001)

Email: cycling.unit@drdni.gov.uk

https://twitter.com/stevenpatt99/status/533592297573994496

There is cause for optimism and much to applaud in the Department for Regional Development (DRD) strategy document for cycling in Northern Ireland. Here are some highlights, slightly trimmed for space:

“..to provide greater choice in the way people travel [we] will work .. to reduce the need for longer journeys and to increase the opportunity for travel by bicycle. This will entail the development of high quality local cycle facilities within new developments and the provision of links with other urban cycle networks, public transport interchanges, the National Cycle Network and the countryside.”

The “..strategy identifies a range of measures that will seek to improve conditions for cyclists and establish a pro-cycling culture. If more people are to be encouraged to cycle, a fundamental shift in attitude will be needed in every part of our society. An increase in safe utility, recreational, tourist and competitive cycling can have economic, health and environmental benefits for society as a whole.”

“Concerns about road safety and our climate are often quoted as reasons why few people cycle in Northern Ireland. However, significant increases in cycling have been achieved through pro-active policies and actions in other European countries having similar weather conditions.”

The “..creation of a cycle-friendly road network is important if more people are to be encouraged to cycle. The traffic management measures needed to improve conditions for cyclists .. will involve the re-allocation of road space from the motorist to the cyclist, however, this will require a fundamental shift in attitude on the part of transport and infrastructure providers and the support of the general public.”

“Our long-term infrastructure objective is to create a network of high quality cycle routes .. [these] may be on-road or off-road and will include dedicated cycle tracks, shared use surfaces, traffic calmed roads and may make use of paths across parks and other open spaces.”

The “..conversion of footways and footpaths to shared use by cyclists and pedestrians will only be considered where there is no other opportunity to improve conditions safely for cyclists on the carriageway or elsewhere.”

We will “..implement an ongoing programme of secure, convenient and, where appropriate, covered cycle parking provision at new and existing main public transport interchanges and park and ride sites .. [and] in main town centres.”

We will:

  • develop local cycling targets and strategies that will encourage more people to cycle
  • implement a programme of traffic calming schemes and 20 mph zones and afford greater priority to collisions involving cyclists in the prioritisation of these schemes;
  • monitor road traffic collisions in which cyclists are involved and initiate appropriate remedial action
  • improve cycle access in towns by the development of planned urban cycle networks and provide at least an additional 50 miles of urban cycle route
  • adopt recognised good practice in cycle-friendly provision and apply detailed cycle audit procedures to ensure that pro-cycle facilities are actively considered during the design of road schemes
  • apply cycle review procedures to major commuter corridors in Belfast and Londonderry

“In developing an action plan to address these issues, the objective will be to achieve a shift in the perception and behaviour of a large section of the general public.”

Targets:

  • double the number of trips by cycle in 5 years
  • quadruple the number of trips by cycle in 15 years

The “..strategy represents a significant commitment to cycling by Government.”

The strategy contains some excellent and progressive content, setting a strong commitment to embedding cycling firmly within the transport mix in Northern Ireland. There’s even recognition that “dedicated cycling tracks” are needed in urban areas which will take road space away from motor vehicles. It talks the talks, and promises to walk the walk – just what a progressive cycling strategy needs to be in 2014.

Except (if you haven’t it figured out by now) this isn’t from the new draft Bicycle Strategy for Northern Ireland 2014.

BicycleStrategyNI

This is all lifted from the Northern Ireland Cycling Strategy 2000 (PDF, 8.56MB) published back when the politician at the DRD helm was the future First Minister of Northern Ireland, Peter Robinson (to this day a regular cyclist). Technically, it’s still the framework for cycling in Northern Ireland (that second target was to 2015).

PeterRobinsonCycling

This isn’t a full autopsy on the 2000 strategy to determine its failures and successes; for the most part, that will be obvious with even a basic knowledge of current cycling conditions here. In reading DRD’s new strategy, it’s important to remember our history, so that we are not doomed to repeat the mistakes.

I’m not even going to critique the new draft Bicycle Strategy for Northern Ireland line by line – smart heads in DRD have kept it light and punchy, easy to read – so go and draw your own conclusions (PDF, 699K). It’s in consultation until Friday 21st November, so if you have even a passing interest in seeing cycling conditions improve in Northern Ireland please send your views to cycling.unit@drdni.gov.uk. I’ll publish my submission when it’s sent.

Cargobike Dad tackles the new strategy and matches my own positive thoughts on how its shaping up. However, this includes the concerning use of cyclist ‘user profiles’ to influence future route design. Dutch cycle network design principles and density means everyone can cycle everywhere. DRD want to be “visionary in our approach and we want to embrace innovation” so why this rush to compromise at the outset? Hopefully concerns will be taken on board.

https://twitter.com/seanlondonandon/status/504670674862866432

.

In the encounters I’ve had with DRD staff who wrote the strategy (the new Cycling Policy Unit) I’ve found them to be genuine, passionate, open, honest, pragmatic but genuinely open to ideas, savvy operators in a tough Departmental environment and (should it matter) all normal everyday cyclists – the right people in the right place at (hopefully) the right time. They deserve a chance to make a difference.

.

What I’m looking for in the new Bicycle Strategy are signs that DRD thinking has moved on from the previous strategy:

  • that best practice in infrastructure design and network density from established cycling countries will factor in plans and, crucially (given past experience) that cycling plans won’t be vetoed within DRD / Transport NI by more influential voices
  • that DRD recognises and wants to grasp the unique opportunity and tools of centralised government executive powers to set Northern Ireland on a course to surpass other areas of the UK and Ireland, not coast in the wake of their failure (in comparison to Netherlands / Denmark etc)

Despite the hyperbole of Danny Kennedy’s call for a “cycling revolution”, I am sold on the Minister’s commitment (and that of his advisors and staff) to what cycling investment can deliver for his department and for Northern Ireland.

Yet two things might override these good intentions:

  • elections in May 2016 which will almost certainly see a new Minister in place (likely from a different political party) who may not share the developing vision for cycling
  • an over-reliance on ‘gambling’ for monitoring round money to deliver cycling projects, rather than a fixed proportion of central funding

Austerity is beginning to rain down hard on budget rounds, and only half of DRD’s £2m capital bids for cycling in June were approved. What chance will cycling have during future budget squeezes, without reliable core ring-fenced funding?

One sentence from the new strategy shows why this is fundamental to success, and why the old strategy didn’t achieve much:

Since 2002 the Department has invested over £10 million in the development and expansion of cycle lanes and on cycling infrastructure measures.

Which broadly speaking means DRD committed around 50p per head of Northern Ireland population each year for most of the lifetime of the 2000 strategy, compared to €24 in the Netherlands. And the headline result*?

NI bicycle journey share in 2000? 1%.

NI bicycle journey share in 2013? 1%.

In hindsight it’s fortunate that the 2000 strategy tried to “encourage cyclists to wear helmets” because that’s 14 years of head-butting brick walls. However there are some encouraging recent signs of cycling growth in Belfast especially, and DRD’s future plan to raise annual per head spending to £4 may begin to make some impact.

It’s important to set the new Bicycle Strategy for Northern Ireland in this context – it’s a positive high-level vision, but words don’t guarantee significant change, as the 2000 document shows. The devil will be in the detail of delivery plans, local masterplans, securing continuous funding and retaining political will. Hopefully this time round things are different, and I wish DRD well at the start of their new journey.

*DRD NI Travel Survey: Average number of journeys per person per year

ROBblog

 

 

,

 

 

On Friday 20th June 2014, the second annual Ride On Belfast event took to the city streets. Last year, around 70 people rode from the Gasworks to the City Hall, inspired by and assembled under the banner of The Fréd Festival. This year the theme was ruthless expansion, with the twin aims of:

  • being the biggest peloton in Belfast since the Giro d’Italia
  • encouraging people not used to cycle commuting to try it out

That was the simplest expression of what Ride On Belfast is about – people riding bicycles in Belfast for their own reasons, whether being the most practical way to work, for the school run, for their health or just the enjoyment. It’s not a protest, it’s not ‘taking back’ the roads, it’s not causing aggro to others – just riding a bike.

But to make this year really special, we needed some new, innovative tactics..

The Weather Underground

Belfast is used to long arid summers, heatwaves lasting months and emergency air-drops of Mr Frostie supplies, but Fréd and his goons needed to be sure that precipitation wasn’t going to affect Ride On Belfast. There was nothing for it – with a brass neck, we tweet-bombed all of the finest weather presenters on local television, and Frank Mitchell too.

And by jove, the BBC crew got into the spirit, with Angie Phillips retweeting, Barra Best tweeting his own predictions, and the fabulous Cecilia Daly (the new darling of Belfast cycling) going the extra mile..

And so, the day before Ride On Belfast gathered, we got our first official ‘national’ weather forecast!

[gigya src=”https://abfiles.s3.amazonaws.com/swf/default_player_10.swf” style=”background-color:transparent; display:block; box-shadow:0 0 1px 1px rgba(0, 0, 0, 0.15); min-width:349px; max-width:700px;” flashvars=”image_option=small&imgURL=https%3A%2F%2Fd15mj6e6qmt1na.cloudfront.net%2Fi%2F9638374%2F300x300%2Fc&link_color=%23c70067&mp3Author=nigreenways&mp3Duration=45505.0&mp3LinkURL=https%3A%2F%2Faudioboo.fm%2Fboos%2F2273070-ride-on-belfast-gets-a-personalised-weather-forecast&mp3Time=11.43pm+21+Jun+2014&mp3Title=Ride+On+Belfast+gets+a+personalised+weather+forecast&mp3URL=https%3A%2F%2Faudioboo.fm%2Fboos%2F2273070-ride-on-belfast-gets-a-personalised-weather-forecast.mp3%3Fsource%3Dwordpress&player_theme=dark&rootID=boo_player_1&show_title=true&waveimgURL=https%3A%2F%2Fd15mj6e6qmt1na.cloudfront.net%2Fi%2Fw%2F724171″ width=”600″ height=”150″ allowFullScreen=”true” wmode=”transparent”]

And as it turned out, the weather was just about perfect on the day..

 

The Gathering

https://twitter.com/ellenfromnowon/status/479874513573019648

This year’s Ride On Belfast was helped by some last minute news from Translink, as their early morning ban on bicycles on trains was eased to accommodate those travelling for the event:

This was a most welcome nod to active travel, and hopefully will give Translink and DRD pause to consider trialling this over a longer period.

https://twitter.com/BelfastCyclist/status/480028818204536833

https://twitter.com/bernie_stocks/status/479921650725814272

The gathering crowd was impressed to see Northern Ireland’s Transport Minister Danny Kennedy ride into the bunch with his new Cycling Unit in tow. Regular cyclist and MLA Sammy Douglas also joined in.

Minister Danny Kennedy arrives with his bicycle outrides
Minister Danny Kennedy arrives with his bicycle outriders

 

The Grand Départ

Under severe pressure from hungry commuters, the peloton set off a little earlier than planned. With a tight first turn from the Gasworks green onto the road, the Minister seized his opportunity and put in a devastating early kick. This split the peloton at the Ormeau Road crossing, and the breakaway group was never caught again. Apparently, Danny Kennedy’s sprint finish down Donegall Place was a phenomenal sight.

https://twitter.com/MrVirtualGill/status/479892607603343360

[youtube https://www.youtube.com/watch?v=XbGdaI6zEqc?rel=0&w=600&h=338]

 

On The Open Road

This year Ride On Belfast took an extended trip around Belfast, leading to an iconic roll down Royal Avenue towards the City Hall. The PSNI officers took a relaxed back seat this year, yet the busier junctions were taken with ease. Notable pinch points (again) were the length of time to traverse Shaftesbury Square (not great for cycling at all) and the bus lane at Great Victoria Street (still not great for buses, never mind cycling). Holding the outside lane along Carrick Hill worked to control what was expected to be the busiest and fastest traffic of the ride. The traffic-restricted streets of the city centre were a joy.

[youtube https://www.youtube.com/watch?v=5uxRPmcbSYY?rel=0&w=600&h=338]

https://twitter.com/GeoffCaves/status/479919201080311808

https://twitter.com/jonathan_alban/status/479886080544882688

 

Selfie On Belfast

After the last year with Máirtín Ó Muilleoir as Lord Mayor, Belfast has fallen in love with the selfie. As well as people just taking them for the craic, See.Sense also ran a competition for the best selfie taken by their stand at Belfast City Hall..

https://twitter.com/BelfastAikido/status/479895033630699520

https://twitter.com/KillinchyCC/status/479929158337069056

https://twitter.com/GeoffCaves/status/479915437950763008

https://twitter.com/dbinterz/status/479921452708548608

https://twitter.com/clairemulv/status/480005258463416320

 

City Hall and well-earned grub

A huge thank you again to Travelwise and Belfast City Council for providing a free breakfast at the Bobbin Cafe (and the new option of a free coffee at Javaman) for those who completed Ride On Belfast. The City Hall grounds became a sea of bicycles for the morning, while local cycle lighting tech firm See.Sense showed off their wares and PSNI bike officers were busy security-marking bicycles for the punters.

Inside the City Hall, the breakfast queue stretched out the door (which is testament to the rise in participation at Ride On Belfast) and we’re all grateful to the Bobbin staff for coping under severe pressure.

https://twitter.com/KillinchyCC/status/479930501453848576

https://twitter.com/lobsterbane/status/479917543784996864

 

The Media

Straight after the event, our Twitter traffic was enough to set #RideOnBelfast trending locally – maybe next year “sectarianism” can be beaten by cycling? Little steps..

Paul Reilly brought the UTV cameras down to see what all the fuss was about, and importantly set the day in context with a reminder of the shocking scene of a child’s bicycle under a truck at Ballyhackamore the day before. Along with the tragic death of 5 year old Conor O’Neill 9 days before, Bike Week had a strong focus on road safety and infrastructure improvement this year.

DKROB

https://twitter.com/GregorClaus/status/480273772008988672

The Irish News covered the event in its Saturday edition. Might need to check that ear-to-shorthand connection though, as ‘enthusiast’ (a word I’m almost violently resistant to when it comes to practical cycling) somehow crept into a quote. And “giro d’italia” needs capitals. #facepalm

 

The Aftermath

Ride On Belfast turned out to be a really positive, fun event and this was reflected in social media comments directly afterwards. We had new cycling commuters, people trying out cycling for the first time in years, as well as familiar faces.

https://twitter.com/BarryParke/status/479964204578136065

https://twitter.com/donnakmonteith/status/479984227816337409

https://twitter.com/theflyingfanny/status/479913575453315072

https://twitter.com/lobsterbane/status/479914027989344256

https://twitter.com/donnakmonteith/status/480053273609904128

https://twitter.com/lobsterbane/status/479922578476523521

https://twitter.com/ellenfromnowon/status/479913587113492480

https://twitter.com/ukprototype/status/479951509275566080

https://twitter.com/KillinchyCC/status/479952404700725248

In the end, the various breakaway groups which started from the Gasworks numbered 150, with close to 200 registered for the bicycle breakfast at City Hall. Overall that was a doubling of participation from 2013, which is a credit to all involved – The Fréd Festival, Travelwise (DRD) and Belfast City Council.

A quick whizz through the @nigreenways highlights of the year..

January

2013 began with a bang in Belfast – remember flegs? – and NI Greenways couldn’t resist getting in on the rush hour hysteria. Amid the rumours of roads being blocked and large roving protests popping up to cause maximum traffic disruption, canny commuter cyclists still had time to observe normal city life; and this commuter caused a mini panic among office workers at 5pm on a Friday night..

Continue reading “Review of the year 2013”

Belfast is in the middle of a mini active travel boom, mainly driven by rising numbers of bike commuters. But Belfast suffers from structural issues which hold back cycling development, not least the physical barrier of the River Lagan. One plan to provide relief, a new pedestrian and cycling bridge linking the Gasworks site to Ormeau Park, has been largely forgotten. Why?

River Lagan from the Gasworks side

The Gasworks Bridge would span 140m between the Lagan entrance to the Gasworks Site and the Ravenhill Reach car park beside Ormeau Park. The project cost is estimated in the region of £4million to £8million. The benefits to the city have been clear for many years:

  • greater access for people in South and East Belfast to the city centre
  • making Ormeau Park a city centre park, accessible by both residents and workers, 15 minute walk from City Hall
  • provide safer pedestrian and cycling options than Albert Bridge and Ormeau Bridge
  • increase in walking and cycling with the health, leisure and transport benefits
  • further encouraging inner city regeneration with a new signature city gateway

This would be the first standalone bridge to be built in Belfast solely for cycling and walking journeys – an important signal of intention to follow through on active travel promotion. Local residents surveys have always returned positive views, with few concerns about potential interface issues. All very positive, but it seems to have dropped off the agenda.

Why is it important?

The spine of the National Cycle Network runs along the western bank of the River Lagan here, connecting a traffic-free route stretching from Lisburn to Newtownabbey, a developing connection to the Comber Greenway (and the Connswater Greenway project) and hopefully all the way to Bangor in the future. The embankment cycle tracks and shared pathways have contributed to an upsurge in active travel, with cycling flow increases of over 250% observed between 2000-2010 (PDF, 499k).

Gasworks from Ravenhill Reach
View from Ravenhill Reach looking down Gasworks / Ormeau Avenue corridor

Adding the bridge would open up east-west journeys on the National Cycle Network, increasing the potential of the Gasworks Park pathway which links almost directly into the city centre. The Gasworks Park hosts large employers like Lloyds and the Northern Ireland Environment Agency, but also the Radisson SAS Hotel. The bridge would not only be a commuter and lunchtime leisure option, but also a tourist facility.

For walking journeys to work, Shaftesbury and Botanic wards lead the way with over 40% of commuter ‘traffic’ on foot. Yet just across the river there is a sharp drop-off with Woodstock and Ballynafeigh wards around 25% and Ravenhill less than 20%. Physical disconnection is at least partly responsible, with long diversions needed to reach the main employment base in the city centre.

The communities surrounding Ormeau Park are also at the forefront of the the current cycling boom. While still quite low levels compared to proper cycling cities around the world, nonetheless Woodstock, Ravenhill and Ballynafeigh are the top 3 wards in the whole of Northern Ireland by cycling commuter share at 5-6%.

© Crown Copyright Land and Property Services / Spatial NI
Commuter cycling share in wards surrounding Gasworks bridge (Census 2011)

A startling 51% of households in Woodstock have no access to a car or van (Census 2011) over double the rate of Northern Ireland as a whole. Direct traffic-free access into the city centre is both desirable and necessary here.

Belfast has seen a 60% rise in cycling commuters between 2001 and 2011. If a Gasworks Bridge contributed to a doubling of cycling levels in these top 3 wards by 2021, cycling levels would outstrip even bus commuting here, which begins to fundamentally change the inner city transport dynamics.

By upgrading cycling routes beyond Ormeau Park, across traffic-calmed residential streets towards Cregagh and Castlereagh Roads and the two Greenways, a genuine and attractive alternative to car travel becomes possible for a large part of South East Belfast. A positive impact on inner city traffic levels must be considered a key element of the bridge’s benefit.

What are the alternative cycling commuter routes?

The existing connections between the city centre and the suburbs of South and East Belfast have become scenes of cycling commuter stress and conflict. The area is poorly served by just two main access points across the Lagan a mile apart, the Ormeau Bridge and the Albert Bridge.

Side of Albert Bridge Belfast
The Albert Bridge in Belfast, a major barrier to cycling uptake in East Belfast

The Albert Bridge is awful for cycling, with it’s narrow road space, ugly crash barriers and no safe cycle space. Roads Service estimates 50% of cyclists use the narrow footpaths rather than the road. Yet as a listed bridge (built in 1890) the options for change are apparently limited.

Ormeau Bridge Belfast
The Ormeau Bridge in Belfast, possibly the busiest cycling intersection in NI

The Ormeau Bridge has a more open feel, but again has no dedicated cycling space. The ghost bike memorial for Michael Caulfield is a stark reminder of how dangerous our roads are for cycling – more so as the Ormeau bridge and embankment intersection is probably the busiest area in Northern Ireland for commuter cycling.

Why has the project faltered before?

Planners have had their eye on a bridge here for decades, but not always for a footbridge. In the rush to build for a motorised future, 1960s plans foresaw an urban motorway running around the Gasworks site and over to Ravenhill. While the motorway plan thankfully fell away in the 70’s, the idea of a more modest distributor road bridging the Lagan and running to the Ravenhill Road lingered through to the 1990s. Along with the main plan for a southern inner ring road, currently in limbo, this has contributed to urban blight through restricted development along the Bankmore corridor.

© Copyright Albert Bridge and licensed for reuse under Creative Commons Licence
Bankmore Street, effectively abandoned to a road scheme that never happened

Lately with the recognition that a road scheme would not be viable or attractive, and the redeveloped Gasworks site opening in 2001,  the idea of a traffic-free bridge moved up the agenda. Boosted by the inclusion in the Belfast Metropolitan Transport Plan 2015, it seemed obvious that the bridge would be built quickly, given the success of the wider Gasworks and Laganside projects:

“Two new pedestrian/cycle bridge crossings are proposed to serve key activity spines between the east and western sides of the River Lagan. These will improve the connection between the extension of existing riverside walkways and the more strategic sections of the pedestrian network. These bridges will be funded as part of  the regeneration of Belfast.”

Rumblings of trouble can be seen in a Belfast City Council Development Committee report from 2005, when you look at the number of ‘stakeholders’:

  • Laganside Corporation – Gasworks and riverside regeneration
  • Department for Social Development (DSD) – public realm schemes and Laganside Corporation’s sponsor
  • Belfast City Council – owner and operator of land and facilities on both sides of the river
  • Sustrans – the National Cycle Network runs through the middle of the issue
  • Department of Regional Development (DRD) – NI transport planning and infrastructure, including active travel

Lots of interested parties, but no-one to take a clear lead. It was unfortunate timing that the Laganside Corporation was wound up within 2 years of this, having reached £1 billion of investment in the city.

Lagan looking toward the Gasworks Bridge location

The last major push was around 2009, with talk of the project even being linked to the failed national stadium bid at Ormeau Park. An application for Special EU Programmes Body (SEUPB) Peace III funding “fell down on its demonstration of peace and reconciliation outcomes and its ability to provide a lasting legacy to the peace programme”.

If we’re relying on a 140m river crossing to be a transformative factor in community relations and breaking down sectarian divisions, what hope is there for Northern Ireland? EU Peace funding has been practically ruled out, and the reason is clear when you cut through the ‘additional’ benefits and set out the purpose of the bridge in basic terms:

The project’s most important function is to provide a new transport corridor in Belfast.

Therefore it falls squarely within the remit of DRD and their executive agency Roads Service. A Belfast City Council Development Committee report on the potential construction and maintenance of the bridge from back in 2005 shines a troublesome light on DRD active transport thinking:

“It is obvious that responsibility for the project should be taken up by Roads Service. Initial contact with Roads Service has however been met with a lukewarm response despite the rhetoric in the BMTP etc in regard to walking and cycling as valid means of transport.”

Can DRD to demonstrate they have moved beyond this point, and take ownership of a major project exclusively for active travel? Is there a golden window of opportunity given the ongoing difficulties with the A5 road project?

What is the way forward?

The recently opened Peace Bridge in Derry~Londonderry is a fantastic local example of what can be achieved for urban cycling and walking transport. Around 2,300 people use the bridge every day, and is a challenge to Belfast to replicate or exceed this impressive performance.

PeaceBridge1
The Peace Bridge in Derry~Londonderry

For an international comparison, Copenhagen is one of the leading cities in the world for urban cycling, with a journey share of around 36%. But it’s a city still trying striving to improve, and leading this charge with urban bridge building for non-motorised traffic with the Copenhagen harbour bridges project.

Gemini Residence 3
Bryggebroen cycling and pedestrian bridge in Copenhagen

The Gasworks Bridge is a key element of re-imagining and reworking central Belfast. Council plans are afoot for sweeping regeneration from the Markets area to Sandy Row and Shaftesbury Square. The bridge would open up new possibilities for commuting, leisure, shopping and social trips that aren’t really viable today. It’s easy to overplay the significance, but the bridge even has the potential to help boost the evening economy in the city.

The Gasworks Bridge is a key part of the Belfast Metropolitan Transport Plan 2015, which is still used to determine capital project priority in the current budget period. If the DRD Minister should wish to leave a legacy for Belfast which provides positive encouragement to reduce car journeys, he would struggle to find a better opportunity than the Gasworks Bridge.
.
[youtube http://www.youtube.com/watch?v=GtjBjgHkAAM?rel=0]

What do you think about the idea of a Gasworks Bridge? Will it encourage you to ditch the car? Comments are open below..

*** UPDATE *** 20th June 2013 *** UPDATE ***

A week is a long time in politics, and one week on from this post there is stunning news. Regional Development Minister Danny Kennedy, while addressing the Politically Painless Active Travel conference in Belfast, announced he is to commission a feasibility study into the Gasworks Bridge project!

Danny Kennedy Gasworks Bridge

This is great news for the local community, active travel organisations, councillors and many others who have put in the real work over a decade to see this bridge built. Hopefully DRD / Roads Service will make swift progress, and the project’s overwhelming benefits will ensure a positive outcome. The potential to transform this part of Belfast is immense – with Belfast cycling on the rise, it seems the Gasworks Bridge’s time has come!

Bike Week 2013 offers people in Northern Ireland a unique opportunity to hear from active travel experts and to quiz local politicians on cycling development.

Two free public events in Derry~Londonderry and Belfast on Wednesday 19th June entitled Politically Painless Active Travel will explore the steps to get more people cycling and walking in Northern Ireland. The events are being organised by CTC, Sustrans, Travelwise and Derry City Council.

Registration is free and both events are open to the public.

You can register now for either session on the CTC website.

Headline speakers

Dr Rachel Aldred

Rachel Aldred is a London-based cycling sociologist who teaches and researches transport.

A Senior Lecturer in Transport at Westminster University, blogger and commentator on cycling strategy, policy and culture, Dr Aldred will be speaking about how to reach a critical mass of cycling that flips cycling into the mainstream, and behavioural changes needed for individual and political acceptability.

You can follow Dr Aldred on Twitter at @RachelAldred.

Gordon Seabright

Gordon Seabright is the Chief Executive of the Cyclists’ Touring Club (CTC), the national cycling charity. CTC is an independent charity, with 70,000 members nationally. Gordon took up post in March 2012. He will be giving an overview of the Westminster All Party Parliamentary Cycling Group’s cycling inquiry, getting the fundamentals right and the economic benefits of cycling.

You can follow Gordon Seabright on Twitter at @GSeabright.

Lilli Matson

Lilli MatsonLilli Matson is Transport for London’s (TfL’s) Head of Delivery Planning. She leads TfL’s strategy and planning of surface transport priorities and projects – with a focus on managing freight and transport demand, planning for bus priority across London, promoting walking, cycling, accessible public transport and improving road safety. She will give insights into implementing active travel on crowded roadspace and the political leadership needed.

© Copyright laurentka and licensed for reuse under Creative Commons Licence

Politically Painless Active Travel seminar

Getting more safer walking and cycling
The Guildhall, Derry~Londonderry
10am Wednesday 19 June 2013

10.00 Registration and coffee

10.20 Jimmy Spratt MLA
Welcome from the Chair of Regional Development Committee

10.25 Dr Rachel Aldred
How to reach a critical mass of cycling that flips cycling into the mainstream and behavioural changes needed for individual and political acceptability

10.50 Denise Gallanagh-Wood (An Taisce) and Michele Murphy (Sustrans)
Getting the nation walking and cycling and the success of green schools in Ireland and Bike It in Northern Ireland

11.15 Dr Willie Burke (Derry City Council) and Ross McGill (Sustrans)
Route Development and promotion in Derry~Londonderry

11.45 Break

12.00 Lilli Matson (Transport for London)
Implementing active travel on crowded roadspace and the political leadership needed

12.25 Gordon Seabright (CTC Chief Executive)
Overview of the Westminster All Party Parliamentary Cycling Group inquiry, getting the fundamentals right and the economic benefits of cycling

12.45 Questions

13.00 Finger buffet

13.30 Walk~Cycle to the Peace Bridge and Riverside Greenway to look at Derry~Londonderry’s active travel infrastructure

14.00 (back at The Guildhall) Sean Lynch MLA
The Deputy Chair of the Regional Development Committee chairs the afternoon session – a member from each of the 5 main Northern Ireland political parties gives the party view on walking and cycling, and then questions from the floor

15.15 Gordon Seabright (CTC Chief Executive)
Summing up

15.30 Close

**Anyone travelling from Belfast to The Guildhall/Peace Bridge event can take advantage of the superb rail link to the North West. Enjoy free WiFi and a relaxing trip along one of the most picturesque rail journeys in Europe. The 07.10 departure from Belfast Great Victoria Street will arrive at Derry~Londonderry at 9.25am. It’s a £17.50 day return from Belfast.

Whoever99 at en.wikipedia [CC-BY-SA-3.0 (http://creativecommons.org/licenses/by-sa/3.0) or GFDL (http://www.gnu.org/copyleft/fdl.html)], from Wikimedia Commons

Politically Painless Active Travel public meeting

Getting more safer walking and cycling
The MAC (The Factory space), Belfast
6pm Wednesday 19 June 2013

18.00 Arrival & registration

18.10 Regional Development Minister Danny Kennedy
Welcome and Minister’s comment

18.15 Gordon Seabright (CTC Chief Executive)
Overview of the Westminster All Party Parliamentary Cycling Group inquiry, getting the fundamentals right and the economic benefits of cycling

18.40 Dr Rachel Aldred
How to reach a critical mass of cycling that flips cycling into the mainstream and behavioural changes needed for individual and political acceptability

19.05 Denise Gallanagh-Wood  (An Taisce)
Getting the nation walking and cycling and the success of green schools in Ireland

19.30 Tim Edgar (CTC)
CTC Bike Club and Belfast City Council

19.45 Beth Harding (Sustrans)
The results from working in schools

20.00 Gordon Clarke (Sustrans Director Ireland)
Summing up

20.10 Questions

20.25 Regional Development Minister Danny Kennedy
The Minister’s closing comments

20.30 Close

You can register now for either session on the CTC website.

Regional Development Minister Danny Kennedy is in the final stages of considering whether to allow all taxis into bus lanes in Northern Ireland. What appeared just weeks ago to be a done deal in favour of the taxi lobby, has been thrown into the mix again by vocal opposition from ordinary commuters in Belfast. But are Departmental officials giving enough weight to the perception of safety among current cyclists, and crucially the thousands of people Belfast needs to convince to switch to the bike?

The case presented by the Department for Regional Development (DRD) for allowing all taxis into bus lanes is fundamentally weak. Private taxi firms are the only group lobbying for the proposal, and no compelling argument has been brought in favour. It remains the ‘easy’ solution for DRD’s dilemma posed by DOE taxi reform, yet transforms and exaggerates a small scale inconvenience for taxi drivers into a major worry for (current and potential) cyclists in bus lanes.

Taxis want access to bus lanes simply to speed past rush hour traffic – this is clear and obvious. Yet this clashes with both the requirement for an efficient, reliable and attractive bus service (DRD admit bus journey times will be slowed) and the view among cyclists that 2,000+ taxis threatens the sense and reality of safety and security on their journey.

Image supplied by DRD Travelwise

Foxes in the chicken coop

Cyclists launched a campaign against the plan with a City Hall protest and a petition, handed in to the Minister on 13th March. Among the 500+ signatories, many added personal comments to the petition – 76% quoted “safety of bus lanes” as their major concern, effectively a ‘subjective‘ view that private taxis will lessen safety. Views on this ranged from individuals reconsidering their own journey choice to the common belief that it will damage cycling across the city.

Yet to counter cyclists’ fears, DRD officials have been quoting accident statistics in bus lanes. The following was part of a Roads Service submission to the Stormont Regional Development Committee:

“The main issue that was brought up in the consultation was the adverse impact to safety of cyclists, and if I could elaborate a little bit on that … the information we have in the last 3 years up to March ’11, showed that there were very few collisions actually in bus lanes, and of the collisions that were caused in bus lanes were actually crossing manoeuvres; vehicles that were actually crossing from the main traffic flow across the bus lane, possibly into side streets. That was the main cause. In fact the information we have, no accidents that were actually caused between vehicles that were actually allowed to use the bus lane, that were permitted to be there. So from that point of view, we feel that the vehicles that actually use the bus lane and the causation of accidents in the bus lane obviously isn’t an issue … we feel that it will not, hopefully, have a detrimental effect to the safety of cyclists.”

In one sense DRD have done their job correctly here – measuring objective safety and declaring that bus lanes are demonstrably safe spaces for cyclists. But DRD have told us what we already know, and why we’re trying to retain this ‘safer’ network. Not particularly enlightening.

On the other hand, the flawed logic could be compared to a farmer who protects his hen house with a wire fence and strong lock at night. With no evidence or experience of attacks on hens, he takes it as proof that allowing foxes into the coop shouldn’t be detrimental to the safety of hens.

Perception of safety is valued by policy makers (elsewhere)

There are moves to add perception of risk and safety to transport planning in other areas, notably by the Department for Transport in Whitehall. But it seems policy makers in Northern Ireland have little to go on other than collision stats. The situation is quite different in countries where cycling as transport is valued.

Copenhagen is a city where 36% of all trips to work or places of education are made by bike, and they are aiming for 50% as their next milestone between 2015 and 2025 (Belfast has no targets). In their current bicycle strategy document, there is a clear distinction made between accidents (objective safety) and the “sense of security” (subjective safety):

Traffic safety has been greatly improved over the past few years. Statistically, the risk of being involved in a serious accident has fallen by 72% per cycled kilometre since 1996. Copenhageners’ sense of security in the traffic has also improved of late. If this sense of security is to rise even further among current cyclists and potential cyclists alike, the most important areas of focus are creating more space on the cycle tracks, making intersections safer and using behavioural campaigns to improve consideration in traffic – including on the cycle tracks. The general traffic safety efforts are also very important. For example, reducing speed limits for cars where necessary.

In the Netherlands, the principles of ‘sustainable safety’ would mean conflict between fast taxis and slower cyclists would be designed out of, not into, road policy. SWOV, the Institute for Road Safety Research, has also studied subjective safety in traffic (for all users), and points out the weak relationship between objective and subjective safety – which at the very least should lead DRD to question the role of accident statistics as the sole determining factor in the taxi decision. Recognising that at the extremes fear of traffic may affect individual travel choice, the question must be asked about the value of improving subjective safety:

If the objective is the reduction of the number of road casualties, then improving subjective safety in traffic is hardly important. If the objective is to use feelings of being unsafe as an indicator for possible dormant road safety hazards, it is important to assess the validity of these complaints and signals. If the objective is to make people feel at ease in their living environment, and to prevent them from feeling that their own mobility or that of others is impeded by feelings of being unsafe in traffic, then improving subjective safety is important.

Should DRD be using an ‘objective’ measure to dismiss a ‘subjective’ fear, especially one which has great potential to limit personal choices? If the third goal listed above extends to the desire for adding more cyclists to the transport mix in Belfast, then DRD are duty bound to research, evaluate and seek to improve subjective safety of cycling, something worryingly absent from the consultation and the rush to bow to taxi firms’ wishes.

Taxi in the right place: will safer space means more 'normal' cyclists?

And in reality, it’s not as if DRD are lacking for evidence of a problem here. The PARC study linked to the ongoing development of the Connswater Community Greenway found that 60% of people felt roads were too dangerous for cycling, and this in an area of Belfast with some of the highest concentrations of commuter cyclists. Similar findings are available from just down the road in Dublin (report) in a city where for years all taxis have been allowed in bus lanes, or ‘pipes of steel’ as many cyclists would refer to them.

DRD’s own bible for road development, the Belfast Metropolitan Transport Plan 2015 (BMTP) deals with this area. If we quickly brush past embarrassing sentences like “On heavily trafficked roads cycle routes would be expected to be provided as fully segregated facilities” (Dutch-style paths in Belfast? Not on DRD’s watch!) we see that subjective criteria such as safety is considered important:

Attractiveness: Routes must be attractive to cyclists on subjective as well as objective criteria. Lighting, personal safety, aesthetics, noise and integration with the surrounding area are important (my emphasis)

But then judging by the preceding sentence, the BMTP is a wacky tome, from which planners can pick and choose as they desire (see: the largely forgotten Gasworks Bridge).

It’s fair to assume most people who signed the taxis in bus lanes petition cycle regularly on roads, and the message from those who added comments was clear. 76% of people specifically mentioned bus lanes as being valuable safe space for cycling. 25% believed taxis are a uniquely dangerous form of transport, 20% were convinced the plan runs contrary to DRD policies to promote sustainable transport, and interestingly 6% of people indicated that giving up cycling as a result of this plan was a serious option.

We’re making a clear point, but is anyone listening?

The problem with collision statistics #1

DRD’s evidence showing “accidents in the bus lanes obviously isn’t an issue” is based on existing bus lane conditions, which of course doesn’t include the private hire taxis that so concern cyclists. Not only will bus lane traffic be doubled, it will be made more competitive, with new faster vehicles mixing with existing slower users. If you don’t think taxis will create more dangerous situations for cyclists in bus lanes, here’s what William McCausland from Fonacab stated after the City Hall cycling protest:

“The taxis aren’t nearly as large as the buses, so their ability to manoeuvre around the cyclists is going to be much simpler.” Source: UTV

This is exactly the type of reckless attitude that has brought us to this point of protest. Most Belfast bus lanes are at most 3 metres wide. There just isn’t the required safe clearance for a saloon car to pass a cyclist within the boundaries of a bus lane with traffic to the right. This is the type of impatient manoeuvre we so fear, and Fonacab are clearly chomping at the bit to let their drivers engage in. It’s so worrying that a ‘professional road user’ running a taxi firm would have so loose a grasp of Rule 163 of the Highway Code.

“give motorcyclists, cyclists and horse riders at least as much room as you would when overtaking a car”

NI Direct: Highway Code rules 162-169: Overtaking

The problem with collision statistics #2

There is also the troubling issue of relying on collision figures as a true measure of objective road safety. Our friends from Cyclist.ie pointed to a startling piece of research was commissioned in Ireland to attempt to inform road safety policy with an idea of the under-reporting of RTCs. The report showed that the Road Safety Authority’s collision figures were grossly out of step with the numbers of people actually admitted to and discharged from hospital as a result of a RTC – which was 3.5 times greater.

However, when it came to cyclists, over the five year period from 2005-09 the RSA reported 109 seriously injured cyclists on Ireland’s roads. The number of hospital discharges for cyclists involved in a RTC in the same period was 1,050: “The difference in numbers is almost ten-fold“. This is truly shocking.

This struck me on a personal level. I was knocked down just over two years ago, by a vehicle using an operational bus lane illegally. I didn’t require hospital treatment, but at the same time I didn’t report the issue to the PSNI either. Another unreported collision, among how many every year in Northern Ireland?

Cycling in Northern Ireland becoming more dangerous?

Undeniably cycling is becoming more dangerous here, even before allowing taxis in bus lanes. Between 2004 and 2011 road safety has improved in Northern Ireland. However the rate of cyclists killed or seriously injured showed a sharp increase in 2010-11. Broadening it out to include minor casualties as well, the trend is upwards for cycling against a downward trend generally.

Comparison of road user KSI rates in NI 2004-2011 (DOE)

There’s little indication DRD have even recognised this as a particular developing problem, judging by the rush to place thousands of cyclists into conflict with thousands of taxis on tight bus lanes during the busiest periods on our roads.

Bus lanes = cycling network

How crucial are bus lanes to cycling in Belfast at present? DRD development of the Belfast arterial road network has produced a repeating pattern – citybound bus lanes for the morning commute, advisory cycle lanes mainly on the countrybound evening side, with some bus lanes substituting. According to DRD there is just 1.32 miles of segregated cycle tracks in Belfast, with many more areas shared with pedestrians, to varying degrees of usefulness/convenience/safety.

Typical citybound bus lane and countrybound cycle lane set up

But the 48km of bus lanes constitutes a vast swathe of Belfast’s commuter cycling space, especially in the highly congested morning rush. Ignoring subjective safety concerns of existing cyclists will tip the balance of risk and reward in the favour of more private car travel, and all the problems that will bring for Belfast as a city trying to keep pace with modern development – while London’s vision puts us to shame.

The gut feeling that DRD have it all wrong

Ultimately this comes down to instinct. Those of us who currently use a bike on the road make our choice based on the balance of risk and reward for cycling in rush hour, and safer spaces have been demonstrated to make a difference even in Belfast, with rises of over 200% in a decade in some areas. Belfast is still in a period of cycling growth, but there’s no guarantee this will continue without investment in safer infrastructure and signalling to non-cyclists that safety concerns are being factored into transport planning. The gut feeling that roads are not a safe place to be on a bike clearly holds so many people back from cycling, male or female, young or old, rich or poor.

It’s not all bad news from DRD; this is the department which is radically altering Belfast city centre with the goal of improving sustainable transport. And they’re providing the kick start funding for Belfast Bike Hire, which has the potential to transform the city in the long run. But for that to be a success will require many thousands of people, many who have never cycled before, to feel safe enough to pedal the roads of Belfast. If it doesn’t feel safe, it just won’t be attractive.

We are fighting to hold back the tide, with bus lanes rightly valued as some of the safest road space we have. Our low levels of cycling will tell you that bus lanes alone are not the answer, and many people simply will not cycle in traffic at all due to fear. But if we value the rises in cycling seen recently, how can we expect to build upon it when the little safe space we have is being taken away and turned into taxi expressways?

Belfast cyclists have again demonstrated that illegal parking on cycle lanes is creating danger on our roads and wasting public money.

16 volunteers – ordinary everyday people getting to work – logged 143 journeys over 5 days in November 2012, encountering 878 illegally parked vehicles along the way.

The Reclaim Belfast’s Cycle Lanes 2 survey shows that a typical cycling trip has an illegally parked vehicle blocking every 5 minutes or 3 times per journey. But what concerns cyclists most, and remains ignored by DRD, is that Belfast’s rush hour cycle lanes are blocked every 250 metres by an illegally parked vehicle.

It may be difficult to grasp the scale and difficulties caused by this problem if you don’t cycle in rush hour. Participants took video footage of some journeys during the survey week so that you can share the experience:

[youtube http://www.youtube.com/watch?v=OvqGnlhWHGs]

.

The survey has grown to be city-wide, but some areas have regular and stubborn clusters of illegal parking on cycle lanes. Here were the worst 5 roads by average number of blocks per trip:

  1. Shankill Road – 49
  2. Springfield Road – 27
  3. Castlereagh Road – 15
  4. Crumlin Road – 15
  5. Cregagh Road – 7

A new Belfast record was set on the Shankill Road with 53 illegally parked cars blocking the cycle lane on one trip. The survey shows once more the useless nature of advisory cycle lanes, legally unenforceable except during urban clearway times. DRD compromise this ‘cycling’  infrastructure from the start to allow parking outside rush hour, but fail to make them available to cyclists during rush hour.

Reclaim Belfast's Cycle Lanes growing coverage

The outcome of the first survey in July 2012 was largely ignored. DRD promises of reviewed parking enforcement making a difference have not borne fruit.

Belfast commuter cycling grew 60% in the decade to 2011; there are thousands of cyclists on the city’s roads every day. Belfast is in the top 10 UK cities for cycle commuting increases. The Department for Regional Development (DRD) say they have spent millions on Belfast cycling, but they are not providing a cycle network – they’ve created a network of parking lanes. This is against a backdrop of cycling casualties continuing to rise, which bucks the trend of safer roads in Northern Ireland.

Reclaiming our cycle network is important for many reasons:

Pressure must be brought on DRD and Minister Danny Kennedy to stop ignoring the problems which hold down sustainable transport in Belfast . Lack of DRD enforcement is putting some of the most vulnerable road users in harm’s way every day.

Our piecemeal cycle network lies useless, while at the same time DRD plans to flood Belfast’s bus lanes with over 2,000 taxis. DRD only pay lip service to sustainable transport. Belfast cyclists are determined to change this.

Let your MPs, MLAs, Councillors, DRD and Roads Service know how your cycling journey is made more dangerous by illegal parking. Only through concerted action can we hope to see real change.

The people behind Reclaim Belfast’s Cycle Lanes are:

Download the Reclaim Belfast’s Cycle Lanes 2 data report

An announcement is due soon from Regional Development Minister Danny Kennedy on allowing taxis full access to bus lanes in Northern Ireland. With Department for Regional Development (DRD) officials recommending go ahead over clear, vocal and overwhelming objections, it’s time to take quick a step back and ask how we got to this point, and why DRD’s priorities are so muddled? Here are five key issues:

Taxi in cycle lane
The harmonious taxi/cycling relationship

.

Apologies to the rest of NI for another Belfast-centric post, but the vast majority of bus lanes are situated in the greater Belfast area, and one fifth of taxis currently operate here, which could rise under the new licensing regime.

How much will this damage cycling uptake?

Belfast has an ‘aspiration’ to raise the level of cycling in the city to 10% modal share by 2020. Not an official target mind you, which might bind a government department to actually delivering it. This why we fail – we still have one of the lowest modal shares in the whole of Europe.

In the decade to 2011 there has been 60% rise in the number of Belfast commuter cyclists – that’s a 2.1% modal share and almost 2,300 regular cycling commuters. Some areas of south Belfast are already upwards of 5% modal share. We need to add over 8,000 more cyclists to Belfast rush hour to get to 10% share.

This kind of massive surge hasn’t happened to date, so why would busier, more intimidating bus lanes make it more likely to happen?

And what do we lose by denying taxis the use of bus lanes? 24% less people travel to work by taxi than in 2001, down to just over 3,000 people, or a 2.9% share. If these two trends continue, cycle commuters will reach parity with taxi commuters by 2015, and by the next census, the current levels will be reversed in cycling’s favour. That would be just 3,000 cyclists by the way – if we want a total of 10,000 cyclists on our rush hour bus lanes by 2020, why threaten that aspiration for the sake of dwindling numbers of taxi users? Madness.

Why are people in Belfast dissuaded from road cycling? In a recent survey of Belfast residents, 60% of people felt roads were too dangerous for cyclingSo why is DRD salting the earth for the sake of a declining taxi commuting sector?

Taxi in cycle box
Ahh, you get the idea of these pictures… (taxi+bike=no)

.

Why has DRD not listened to objections?

86% of the rubber stamp exercise consultation responses were negative, yet how did DRD choose to handle this? With a real slap in the face to those who responded with the ‘wrong’ view – lumping everyone together with one phrase, “mostly from cyclists“, and dismissing all fears as unfounded.

I’m guessing there’s a warped logic at work – if you can distill 60 objections in to one incorrect opinion, and weigh that against fully 7 (seven) responses welcoming the proposed changes, then we have a majority in favour! That’s how government works! The logic doesn’t work both ways though – just ignore the fact that the 7 (seven) positive responses were mainly from private taxi hire firms. Shhh!

Given the overwhelming negative view on the issue, how will DRD address cyclists’ safety concerns? See if you can hear it..

[soundcloud url=”http://api.soundcloud.com/tracks/78152979″ params=”” width=” 100%” height=”166″ iframe=”true” /]

Audio sourced from the Northern Ireland Assembly – subject to Parliamentary copyright.

If you sent an objection in to DRD, why not follow it up with a complaint that your objection has been effectively disregarded?

Northern Ireland taxis are now…sustainable? Really?!

The whole world will shortly be coming to Northern Ireland to learn how we’ve solved that pesky problem of motor vehicles wrecking the environment. A saloon car taxi (typical of the roughly 1,500 Belfast private hire vehicles) might carry an average of 1-2 passengers per fare, and yet DRD are claiming sustainability is no longer an issue! Listen to this:

[soundcloud url=”http://api.soundcloud.com/tracks/78148272″ params=”” width=” 100%” height=”166″ iframe=”true” /]

Audio sourced from the Northern Ireland Assembly – subject to Parliamentary copyright.

In a public policy exercise as intellectually bankrupt and dishonest as taxis in bus lanes, this marks a new low.

All those saloon cars driving around with 1-2 passengers are perfectly sustainable, as long as they are designated so by government.

DRD should pass this trick on to the Department for Finance and Personnel. Northern Ireland can dump Air Passenger Duty for short haul flights too by simply designating all aircraft as ‘sustainable’. I think Sammy Wilson might actually be game enough to try it..

Another taxi in a cycle box Belfast
Dirty polluting taxi about to magically become a sustainable vehicle

.

Why damage journey times for 13.5% of commuters, for the sake of 2.9% of commuters?

There are no government targets to increase taxi usage – why would there be? Yet this entire policy seems entirely designed for that one purpose. Meanwhile, by the hard numbers from Census 2011 again, 13.5% of people use buses to get to work. In terms of sustainable objectives, reducing rush hour traffic and increasing revenue take for Translink, more bus passengers is a big goal for Belfast.

Just 2.9% of people used a taxi as their main form of transport to work in 2011, down from 4% in 2001.

Metro and Bus Rapid Transit efficiency of service will be one of the big factors which determine success of public transport in Belfast. The consultation itself recognised that taxis in bus lanes would have a negative impact on buses. A report from Amey in 2008 stated “bus lanes are currently underperforming against targets…additional vehicles in the bus lane … would probably contribute to further reduced bus journey speeds”.

How destructive can one little policy be?!

[youtube http://www.youtube.com/watch?v=HOK6mE7sdvs]

.

What is really driving this policy?

Taxi firms must have some truly amazing lobbying powers. Northern Ireland’s wonderfully transparent political system doesn’t allow us the luxury of seeing donations to political parties. So we’re left to wonder why such a poorly designed policy is being railroaded through a hostile consultation exercise, and if the policy wonks have given any weight to the potential damage it could cause?

Is Minister Kennedy running the risk of fatally undermining both Belfast Rapid Transit and the city’s blossoming cycling potential? Two birds, one stone – well it’s more efficient than a Belfast bus lane.

[youtube http://www.youtube.com/watch?v=i3StCJI-tnY]

.

What the people say about taxis in bus lanes

Safer roads were on the agenda at Stomont on Monday 19th November 2012. Questions to the Regional Development Minister Danny Kennedy included the topics of Conall McDevitt’s forthcoming Private Members’ Bill on 20mph zones, and a subject currently close to the heart of the NI Greenways blog, illegal parking in cycle lanes.

Excerpts from the Official Report of Assembly Business:

Judith Cochrane, Alliance MLA for Belfast East - Parliamentary copyright: image is reproduced with the permission of Northern Ireland Assembly CommissionMrs Cochrane asked the Minister for Regional Development what action his Department is taking to address illegal parking in cycle lanes. (AQO 2876/11-15)

Mr Kennedy: I want to begin by saying that I fully appreciate the concerns and frustration of cyclists caused by vehicles that park in cycle lanes during their operational hours. Motorists should be mindful and considerate towards cyclists when using our roads and should not park illegally in cycle lanes.

Roads Service has advised that a traffic attendant can issue a penalty charge notice to a vehicle that is parked on a mandatory cycle lane. However, a penalty charge notice cannot be issued to a vehicle that is parked on an advisory cycle lane, unless other parking restrictions apply; for example, clearway restrictions or bus lanes. When a traffic attendant observes a vehicle parked in a cycle lane in contravention of a restriction, the appropriate enforcement action will be taken.

NI Greenways comment: While welcoming the question, this answer does little to address what Belfast cyclists see as a persistent problem which still isn’t being “tackled” with focus or priority. A July survey by commuter cyclists showed that for every km of restricted lane in Belfast there are 4.5 vehicles illegally parked during rush hour. Advisory cycle lanes with urban clearway restrictions are the dominant form of cycle space in Belfast, with mandatory lanes few and far between, with no recurring reports of illegal parking problems. Refusing to recognise a special problem in some areas of the city means the issue can continue to be largely ignored.

Mrs Cochrane: I thank the Minister for his answer. Will he also give us an update on the parking enforcement awareness programme that was due to commence on 30 October?

Mr Kennedy: I am grateful to the Member. Obviously, the Department encourages cycling. We are committed to providing safer roads for the growing number of cyclists and pedestrians. We have done that through a range of measures such as road safety engineering, traffic calming and the enhancement of the pedestrian and cycling network. All these initiatives, including those brought forward by Travelwise, are key elements of the sustainable travel options involving cycling and its promotion.

Conall McDevitt, SDLP MLA for Belfast South - Parliamentary copyright: image is reproduced with the permission of Northern Ireland Assembly CommissionMr McDevitt: I thank the Minister for his ongoing commitment to cycling. Given that it is the beginning of road safety week, will the Minister indicate to the House whether he is willing to strongly consider the merits of introducing 20 mph zones on a statutory basis or to support the private Member’s Bill due before the House in the coming months that will do so?

Mr Kennedy: I am grateful to the Member for his supplementary question. I know that he is a keen and very active cyclist. I am aware of the private Members’ Bill and of the representations made by those in favour of introducing 20 mph schemes. Although I am not opposed to such schemes, the issue seems to be one of enforcement: how such limits are to be enforced, whether the PSNI can commit the necessary resources and whether responsible motorists and vehicle users will be prepared to accept the restrictions that are placed upon them. That is an ongoing discussion that I am having with my officials, and we will see what emerges.

NI Greenways comment: The level of commitment from MLAs to seeing this important measure gaining passage through the Assembly remains uncertain. The issue of enforcement is one that pops up time and again in 20mph zones debates, and is dealt with along with other weak arguments against on the 20’s Plenty For Us website.